hornadylnl
Shooter
- Nov 19, 2008
- 21,505
- 63
It took my American crew of 6 4 days to roof my less than 40 square roof. It's a simple roof and it was already tar papered.
It will take this Mexican crew of 6 drywallers about 2 days to hang for a 2600 sf house. 9' ceilings on first floor 8' on the 2nd. My great room has an 18' ceiling. Also they are drywalling all of my exterior walls in my 1800 sf basement.
Just a tad difference in pace, I'd say.
It will take this Mexican crew of 6 drywallers about 2 days to hang for a 2600 sf house. 9' ceilings on first floor 8' on the 2nd. My great room has an 18' ceiling. Also they are drywalling all of my exterior walls in my 1800 sf basement.
Just a tad difference in pace, I'd say.